Tight big-Ms for optimal transmission switching

Loading...
Thumbnail Image

Identifiers

Publication date

Reading date

Collaborators

Advisors

Tutors

Editors

Journal Title

Journal ISSN

Volume Title

Publisher

Elsevier

Metrics

Google Scholar

Share

Research Projects

Organizational Units

Journal Issue

Center

Department/Institute

Abstract

This paper addresses the Optimal Transmission Switching (OTS) problem in electricity networks, which aims to find an optimal power grid topology that minimizes system operation costs while satisfying physical and operational constraints. Existing methods typically convert the OTS problem into a Mixed-Integer Linear Program (MILP) using big-M constants. However, the computational performance of these approaches relies significantly on the tightness of these big-Ms. In this paper, we propose an iterative tightening strategy to strengthen the big-Ms by efficiently solving a series of bounding problems that account for the economics of the OTS objective function through an upper-bound on the generating cost. We also discuss how the performance of the proposed tightening strategy is enhanced if reduced line capacities are considered. Using the 118-bus test system we demonstrate that the proposed methodology outperforms existing approaches, offering tighter bounds and significantly reducing the computational burden of the OTS problem.

Description

Bibliographic citation

Salvador Pineda, Juan Miguel Morales, Álvaro Porras, Concepción Domínguez, Tight big-Ms for Optimal Transmission Switching, Electric Power Systems Research, Volume 234, 2024, 110620, ISSN 0378-7796, https://doi.org/10.1016/j.epsr.2024.110620

Collections

Endorsement

Review

Supplemented By

Referenced by

Creative Commons license

Except where otherwised noted, this item's license is described as Atribución 4.0 Internacional