RT Conference Proceedings T1 Effect of Ramping Requirement and Price Cap on Energy Price in a System with High Wind Penetration A1 Martín-Rivas, Sebastián A1 Smeers, Yves A1 Aguado-Sánchez, José Antonio K1 Empresas eléctricas - Tarifas AB The European power market is currently retiring or mothballing large capacities of conventional plants, and at the same time incorporating a significant amount of non-dispatchable renewable generation, in particular wind. We analyse the mothballing process (and the resulting system) and study how they are affected by a price cap implemented in the energy only market, and by a possible implementation of ramping products in the system. YR 2015 FD 2015-10-28 LK http://hdl.handle.net/10630/10618 UL http://hdl.handle.net/10630/10618 LA eng NO Sebastian Martin, Yves Smeers, and Jose Aguado. Effect of Ramping Requirement and Price Cap on Energy Price in a System with High Wind Penetration. In proceedings of the 22nd International Symposium on Mathematical Programming, Pittsburgh, July 12-17, 2015 NO Universidad de Málaga. Campus de Excelencia Internacional Andalucía Tech. DS RIUMA. Repositorio Institucional de la Universidad de Málaga RD 19 ene 2026