<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-05-27T16:20:26Z</responseDate><request verb="GetRecord" identifier="oai:riuma.uma.es:10630/32805" metadataPrefix="mods">https://riuma.uma.es/rest/oai/request</request><GetRecord><record><header><identifier>oai:riuma.uma.es:10630/32805</identifier><datestamp>2026-02-03T10:57:22Z</datestamp><setSpec>com_10630_2254</setSpec><setSpec>col_10630_37953</setSpec></header><metadata><mods:mods xmlns:doc="http://www.lyncode.com/xoai" xmlns:mods="http://www.loc.gov/mods/v3" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
   <mods:name>
      <mods:namePart>Acebes Senovilla, Fernando</mods:namePart>
   </mods:name>
   <mods:name>
      <mods:namePart>Poza García, David</mods:namePart>
   </mods:name>
   <mods:name>
      <mods:namePart>González-Varona, José Manuel</mods:namePart>
   </mods:name>
   <mods:name>
      <mods:namePart>López-Paredes, Adolfo</mods:namePart>
   </mods:name>
   <mods:extension>
      <mods:dateAvailable encoding="iso8601">2024-09-23T08:36:53Z</mods:dateAvailable>
   </mods:extension>
   <mods:extension>
      <mods:dateAccessioned encoding="iso8601">2024-09-23T08:36:53Z</mods:dateAccessioned>
   </mods:extension>
   <mods:originInfo>
      <mods:dateIssued encoding="iso8601">2021</mods:dateIssued>
   </mods:originInfo>
   <mods:identifier type="citation">Acebes, F., Poza, D., González-Varona, J. M., &amp; López-Paredes, A. (2022). Stochastic earned duration analysis for project schedule management. Engineering, 9, 148-161.</mods:identifier>
   <mods:identifier type="issn">20958099</mods:identifier>
   <mods:identifier type="uri">https://hdl.handle.net/10630/32805</mods:identifier>
   <mods:identifier type="doi">10.1016/j.eng.2021.07.019</mods:identifier>
   <mods:abstract>Earned duration management (EDM) is a methodology for project schedule management (PSM) that can be considered an alternative to earned value management (EVM). EDM provides an estimation of deviations in schedule and a final project duration estimation. There is a key difference between EDM and EVM: In EDM, the value of activities is expressed as work periods; whereas in EVM, value is expressed in terms of cost. In this paper, we present how EDM can be applied to monitor and control stochastic projects. To explain the methodology, we use a real case study with a project that presents a high level of uncertainty and activities with random durations. We analyze the usability of this approach according to the activities network topology and compare the EVM and earned schedule methodology (ESM) for PSM.</mods:abstract>
   <mods:language>
      <mods:languageTerm>eng</mods:languageTerm>
   </mods:language>
   <mods:accessCondition type="useAndReproduction">http://creativecommons.org/licenses/by-nc-nd/4.0/</mods:accessCondition>
   <mods:accessCondition type="useAndReproduction">open access</mods:accessCondition>
   <mods:accessCondition type="useAndReproduction">Attribution-NonCommercial-NoDerivatives 4.0 Internacional</mods:accessCondition>
   <mods:subject>
      <mods:topic>Gestión de proyectos</mods:topic>
   </mods:subject>
   <mods:titleInfo>
      <mods:title>Stochastic Earned Duration Analysis for Project Schedule Management.</mods:title>
   </mods:titleInfo>
   <mods:genre>journal article</mods:genre>
</mods:mods>
</metadata></record></GetRecord></OAI-PMH>