<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-05-30T22:24:12Z</responseDate><request verb="GetRecord" identifier="oai:riuma.uma.es:10630/34219" metadataPrefix="rdf">https://riuma.uma.es/rest/oai/request</request><GetRecord><record><header><identifier>oai:riuma.uma.es:10630/34219</identifier><datestamp>2026-02-03T11:13:48Z</datestamp><setSpec>com_10630_2254</setSpec><setSpec>col_10630_37953</setSpec></header><metadata><rdf:RDF xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:doc="http://www.lyncode.com/xoai" xmlns:ds="http://dspace.org/ds/elements/1.1/" xmlns:ow="http://www.ontoweb.org/ontology/1#" xmlns:rdf="http://www.openarchives.org/OAI/2.0/rdf/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/rdf/ http://www.openarchives.org/OAI/2.0/rdf.xsd">
   <ow:Publication rdf:about="oai:riuma.uma.es:10630/34219">
      <dc:title>Evaluating success in PPP road projects in Europe: a comparison  of performance measurement approaches</dc:title>
      <dc:creator>Villalba-Romero, Felix</dc:creator>
      <dc:creator>Liyanage, Champika</dc:creator>
      <dc:subject>Carreteras - Diseño y construcción</dc:subject>
      <dc:description>This research aims to identify how to measure the level of success of a Public Private Partnership (PPP) projects using case &#xd;
studies along Europe. The analysis is based on a Performance Measurement System (PMS) using a step-by-step approach. &#xd;
Altogether 13 PPP road projects in the EU have been chosen to test the PMS. Two measurement approaches have been used to &#xd;
analyse the performance of these case studies. Herein, altogether 29 performance measures (PMs) and 9 key performance &#xd;
indicators (KPIs) that have been developed systematically have been considered. The first approach used has evaluated the &#xd;
number of successful and failure performance measures in order to show different level of success in projects. In this approach, &#xd;
the weighting used for the performance measures are considered equal. The second approach has been then used to weight the &#xd;
PMs using a Delphi analysis first, and then to evaluate overall performance. The comparison of the results reveal that there are &#xd;
dominant PMs and KPIs that determine the success of a project. The results illustrate how PPP projects may be evaluated to &#xd;
extract conclusions about the success/failure of a project from a global view, showing the areas and elements that need to be &#xd;
considered along this process.</dc:description>
      <dc:date>2024-10-02T11:53:36Z</dc:date>
      <dc:date>2024-10-02T11:53:36Z</dc:date>
      <dc:date>2016</dc:date>
      <dc:type>journal article</dc:type>
      <dc:identifier>Villalba-Romero, F., &amp; Liyanage, C. (2016). Evaluating success in PPP road projects in Europe: a comparison of performance measurement approaches. Transportation Research Procedia, 14, 372-381.</dc:identifier>
      <dc:identifier>https://hdl.handle.net/10630/34219</dc:identifier>
      <dc:identifier>10.1016/j.trpro.2016.05.089</dc:identifier>
      <dc:language>eng</dc:language>
      <dc:rights>open access</dc:rights>
      <dc:publisher>Elsevier</dc:publisher>
   </ow:Publication>
</rdf:RDF>
</metadata></record></GetRecord></OAI-PMH>