dc.description.abstractThe problem addressed is the Power Plant Preventive Maintenance Scheduling. The problem is taken from the power industry and it requires determining the perioThis paper addresses the Power Plant Preventive Maintenance Scheduling Problem. The problem is taken from the power industry, where providing electric energy to the consumers without interruption is of high importance. This problem is usually treated in the long-term exploitation of electric production systems. It requires determining the period for which generating units of an electric power utility should be taken offline for planned preventive maintenance over a time horizon, usually on a yearly basis. The objective is to minimize the total operating cost while a set of constraints is satisfied, with emphasis on realiability.en_US
dc.description.sponsorshipUniversidad de Málaga. Campus de Excelencia Internacional Andalucía Tech.en_US
dc.language.isoengen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectMantenimiento preventivoen_US
dc.subjectCentral eléctricaen_US
dc.subject.otherPreventive maintenanceen_US
dc.subject.otherPower planten_US
dc.subject.otherCost optimizationen_US
dc.titlePower plant preventive maintenance scheduling problem: a 0/1 mixed integer linear programming approach based on cost and reliability to establish an effective policyen_US
dc.typeinfo:eu-repo/semantics/conferenceObjecten_US
dc.centroEscuela de Ingenierías Industrialesen_US
dc.relation.eventtitle26th EurOMA Conferenceen_US
dc.relation.eventplaceHelsinki, Finlandiaen_US
dc.relation.eventdateJunio 2019en_US