Mostrar el registro sencillo del ítem

dc.contributor.authorPérez-Canto, Salvador 
dc.date.accessioned2014-07-02T07:58:21Z
dc.date.available2014-07-02T07:58:21Z
dc.date.created2014-06
dc.date.issued2014-07-02
dc.identifier.urihttp://hdl.handle.net/10630/7754
dc.description.abstractThis paper presents an approach to preventive maintenance scheduling of power plants for electric systems. The problem under study is an optimization problem and has been formulated with a cost-based criterion. The main aim is to know which power plants must stop their operation of elec-tricity production for periodic inspection over a time horizon. The management of this problem has a considerable impact on power system performance because an unexpected failure in a power plant may cause a general breakdown in an electric system. The main consequence would be that the elec-tric demand could be unsatisfied. The global electric system modeled comprises the most important types of power plants: thermal, hydroelectric, nuclear, and wind power plants. A realistic application example is included.es_ES
dc.description.sponsorshipUniversidad de Málaga. Campus de Excelencia Internacional Andalucía Tech.es_ES
dc.language.isoenges_ES
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectEmpresas eléctricas - Gestiónes_ES
dc.subject.otherPreventive maintenancees_ES
dc.subject.otherPower plantes_ES
dc.subject.otherSchedulinges_ES
dc.subject.otherCostes_ES
dc.subject.otherOptimizationes_ES
dc.titleA model for preventive maintenance scheduling of power plants minimizing costes_ES
dc.typeinfo:eu-repo/semantics/conferenceObjectes_ES
dc.centroE.T.S.I. Industriales_ES
dc.relation.eventtitleInternational Conference on Engineering and Applied Sciences Optimization (OPT-i) 2014es_ES
dc.relation.eventplaceKos, Greciaes_ES
dc.relation.eventdate04/06/2014es_ES


Ficheros en el ítem

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem